Meet Illumate, your MEFSCO data expert. I am here to help you instantly get answers and insight across SAP modules covering Finance, Inventory, Maintenance, Production, Procurement, and Sales. I will also help you visualize on a realtime basis the cross module insights.
Suggested questions
AR Risk Alert: 24% of receivables (3,369,600 SAR) are aged beyond 60 days. This exceeds the 20% threshold and represents a material working capital risk.
Revenue vs Budget
16,200,000SAR
AR Aging
14,040,000SAR
24% over 60 days
AP Outstanding
8,520,000SAR
See aging breakdown below
Cash Position
5,670,000SAR
Available Liquidity
Cost Center Variance
-3.8%
vs. Budget
Working Capital
4,250,000SAR
Current Assets - Liabilities
VAT (Payable / Recoverable)
2430K / 1278KSAR
15% KSA VAT
Zakat Accrual
1,110,000SAR
Provision for Zakat
Revenue vs Budget Trend
AR Aging Breakdown (with amounts)
AP Aging Breakdown
Top Cost Center Contributors to Variance
Cost Center Variance Trend (%)
CRITICAL: Wheat Flour (Grade A) & Vegetable Oil (Refined) -- the most critical raw materials -- are in safety stock breach. Wheat Flour has only 3 days of cover remaining. Food production operations at risk of stoppage.
Stock runs 12-20% above demand while Wheat Flour (most critical material) is in safety stock breach. Possible planning misalignment between MRP and manual reorders.
Safety Stock Breach Details -- Materials at Risk
| Material | Breaches | Days of Cover | Reorder Qty | Status |
|---|---|---|---|---|
| Wheat Flour (Grade A) | 2 | 3 days | 180 Tons | CRITICAL |
| Vegetable Oil (Refined) | 1 | 5 days | 120 Tons | CRITICAL |
| Food Additives | 1 | 7 days | 8 Tons | WARNING |
| Salt (Iodized) | 0 | 18 days | - | OK |
| Packaging Material | 0 | 22 days | - | OK |
| Sugar | 0 | 15 days | - | OK |
Inventory Turnover
4x
Higher is better
Stock Aging
42Days
Avg. Days in Stock
Dead Stock %
7.1%
Non-moving inventory
Safety Stock Breach
5Items
Materials below safety
Stock vs Demand
1.08Ratio
Stock / Demand coverage
MRP -- Materials at Risk This Week
Wheat Flour (Grade A)
Stock-out in 3 days
PO-2026-0412
Awaiting ApprovalVegetable Oil (Refined)
Stock-out in 5 days
PO-2026-0418
Vendor ConfirmedFood Additives
Below safety level
PR-2026-0891
Requisition CreatedBatch Quality Tracking (Moisture % & Yield Impact)
| Batch | Material | Moisture % | Grade | Yield Impact |
|---|---|---|---|---|
| WF-2026-041 | Wheat Flour | 12.2% | A | +1.2% |
| WF-2026-042 | Wheat Flour | 14.5% | B | -0.8% |
| WF-2026-043 | Vegetable Oil | 0.1% | C | -2.4% |
| SA-2026-015 | Salt | 1.1% | A | +0.5% |
Stock vs Demand (Tons)
Inventory Turnover Trend
Overall Equipment Effectiveness (OEE)
72.1%
OEE Score
88.5%
Availability
84.8%
Performance
96.5%
Quality
Equipment Downtime
22.4Hrs
Cumulative
MTTR
2.1Hrs
Mean Time to Repair
Preventive vs Corrective
68%
Target: 78%
Cost per Asset
75,000SAR
Cumulative
Work Order Backlog
14Orders
3 overdue
Equipment Downtime Breakdown (by Asset & Criticality)
| Equipment | Func. Location | Criticality | Downtime (Hrs) |
|---|---|---|---|
| Production Line #1 (Milling) | PL-01-ML1 | Class A | 1.5 hrs |
| Mixer Unit #2 | PL-01-MX2 | Class A | 0.8 hrs |
| Packaging Machine #1 | PL-01-PK1 | Class B | 0.4 hrs |
| Quality Check System | PL-02-QC1 | Class B | 0.3 hrs |
| Refrigeration Unit | UT-01-REFR | Class C | 0.2 hrs |
Overdue Work Orders (with Equipment Criticality)
WO-4521 - Mixer Unit #2
Corrective | 3 days overdue
WO-4489 - Packaging Machine #1
Preventive | 5 days overdue
WO-4502 - Refrigeration Unit
Corrective | 2 days overdue
Downtime & MTTR Trend
Work Order Status Distribution
Production is -9.7% below plan. Scrap rate at 3.5% is above the 1-2% industry norm = ~58.8 tons/day lost = ~176,400 SAR daily waste.
Production vs Plan
1,680Tons
Capacity Utilization
84.8%
Plant Utilization
Scrap Rate
3.5%
~58.8T lost = 176,400 SAR
Cycle Time
44Min
Avg. per batch
Energy / Ton
1,920kWh
Energy consumption
Production Deviation Reasons (Cross-Module Root Cause)
Jan 4: -13.5%
Production Line #1 downtime (5.2 hrs)
Jan 5: -16.1%
Wheat Flour safety stock breach
Jan 1: -11.3%
Mixer Unit corrective maintenance
Product-Grade Output Breakdown
| Product Grade | Machine | Planned | Actual | Variance | Margin |
|---|---|---|---|---|---|
| Refined Wheat Flour | PL-1 | 105T | 98T | -6.7% | 22% |
| Instant Flour Mix | PL-2 | 120T | 108T | -10.0% | 15% |
| Baking Flour | PL-3 | 55T | 52T | -5.5% | 28% |
| Specialty Flour | PL-1 | 30T | 27T | -10.0% | 18% |
Production vs Plan Trend
Energy Consumption per Ton (kWh)
Cycle Time Trend (Minutes)
Output Variance Trend (%)
PO Cycle Time
5.8Days
Internal SAP processing
Vendor Performance
79/100
Supplier Score
Purchase Price Variance
-3.1%
Favorable (below std cost)
Contract Compliance
85%
Target: 90% | Gap: 5%
Total Spend
17,400,000SAR
All categories
Supplier Concentration Risk
| Supplier | Material | Share | Risk |
|---|---|---|---|
| Arabian Grain Trading | Wheat Flour | 45% | HIGH |
| Gulf Food Suppliers | Wheat Flour | 25% | MEDIUM |
| Middle East Commodities | Wheat Flour | 15% | LOW |
| Al Mansour Trading | Vegetable Oil | 10% | LOW |
| Others | Various | 5% | LOW |
Materials in Transit (Import Lead Times)
Wheat Flour (Premium) -- Arabian Grain Trading
PO-4521 | Origin: Australia
ETA: 18 days
1,200,000 SAR
Vegetable Oil (Refined) -- Gulf Food Suppliers
PO-4535 | Origin: Malaysia
ETA: 24 days
850,000 SAR
Flour Mix -- Middle East Commodities
PO-4542 | Origin: Ukraine
ETA: 32 days
680,000 SAR
Contract Compliance by Vendor Category
PPV Trend (Negative = Favorable)
Spend by Category (SAR)
Sales vs Target
18,400,000SAR
Margin %
17.8%
Gross Margin
Top Distributor
4,920,000SAR
Al Rajhi Trading
Top SKU
30%
Refined Wheat Flour
Domestic / Export
70% / 30%
KSA / GCC Split
Region Performance (SAR) -- Named Regions
Margin per SKU (Revenue & Profit Contribution)
| SKU | Revenue | Margin |
|---|---|---|
| Copy Paper A4 | 1024K | 22.1% |
| Kraft Paper | 768K | 17.8% |
| Tissue Base | 576K | 28.4% |
| Corrugated Medium | 480K | 14.6% |
| Specialty Grade | 352K | 31.2% |
Domestic (KSA) vs GCC Export Split
Seasonal Demand Comparison (Daily Avg. SAR)
Distributor Performance (SAR)
SKU Volume Contribution (%)
Sales (SAR K) vs Production Output (Tons)
Inventory Level (Tons) vs Sales Velocity (SAR K)
Procurement Spend (SAR K) vs Margin Impact (%)
Maintenance Downtime (Hrs) vs Production Output (Tons)
Financial Impact of Inventory Aging (SAR K)